Rectification Workspace

Address the return remarks and resubmit corrected documents

⚠ Action Required
↩
File Returned by: D.K. Patel (Executive Engineer) on 12 Oct 2026, 10:15 AM
Reason: Missing Documents — Geotechnical survey report with bore log data required for all pier locations.
💬 Return Remarks from EE

The following corrections are required before this file can proceed:

  1. Geotechnical survey report from NABL accredited agency
  2. Bore log data for all 8 pier locations
  3. Updated soil bearing capacity analysis
Deadline: 10 Nov 2026 (15 working days)
📝 Rectification Response

The following rectification actions have been taken:

1. Geotechnical survey conducted by M/s Geo-Tech Labs (NABL Accredited, Certificate No. TC-7892)

2. Bore log data obtained for all 8 pier locations (Chainage 4+200 to 8+600)

3. Soil bearing capacity: 18-22 T/sqm (as per IS:1904-1986)

4. Foundation type recommendation: Well foundation (12m depth)

📎 Upload Corrected Documents
☁

Click or drag files to upload

Supported: PDF, DOCX, XLSX (Max 10MB per file)

PDF
Geotechnical_Survey_Report.pdf
3.8 MB · Just uploaded
NEW
XLS
Bore_Log_Data_All_Piers.xlsx
1.2 MB · Just uploaded
NEW
PDF
Soil_Bearing_Capacity_Analysis.pdf
890 KB · Just uploaded
NEW
✅ Rectification Checklist
✅ 3 of 4 items completed
📄 File Information
File Number RB/2026/GNR/0456
Returned By D.K. Patel (EE)
Return Date 12 Oct 2026
Deadline 10 Nov 2026
Days Remaining 13 days